Time study on different techniques for nursery pot filling operation.
Ole-Meiludie R. E. L., Pamba G. K. (1988). Time study on different techniques for nursery pot filling operation. Silva Fennica vol. 22 no. 2 article id 5349. https://doi.org/10.14214/sf.a15506
Abstract
Time study on different techniques in nursery pot filling operations at SUA Training Forest in Northern Tanzania was conducted. The results showed that improved tools and work place design significantly decreased the operation time, hence increased productivity. In addition, worker’s comfort was generally increased.