Full text of this article is only available in PDF format.

Raphael E. L. Ole-Meiludie (email), Goodseldah K. Pamba

Time study on different techniques for nursery pot filling operation.

Ole-Meiludie R. E. L., Pamba G. K. (1988). Time study on different techniques for nursery pot filling operation. Silva Fennica vol. 22 no. 2 article id 5349. https://doi.org/10.14214/sf.a15506

Abstract

Time study on different techniques in nursery pot filling operations at SUA Training Forest in Northern Tanzania was conducted. The results showed that improved tools and work place design significantly decreased the operation time, hence increased productivity. In addition, worker’s comfort was generally increased.

The PDF includes a summary in Finnish.

Keywords
productivity; time study; Tanzania; nursery pot filling; forest tree nursery

Published in 1988

Views 2361

Available at https://doi.org/10.14214/sf.a15506 | Download PDF

Creative Commons License CC BY-SA 4.0

Register
Click this link to register to Silva Fennica.
Log in
If you are a registered user, log in to save your selected articles for later access.
Contents alert
Sign up to receive alerts of new content

Your selected articles
Your search results