Full text of this article is only available in PDF format.

Pertti Harstela (email)

Eräiden koneellistamisennusteiden herkkyydestä kustannustason muutoksiin.

Harstela P. (1974). Eräiden koneellistamisennusteiden herkkyydestä kustannustason muutoksiin. Silva Fennica vol. 8 no. 2 article id 4900. https://doi.org/10.14214/sf.a14744

English title: The influence of the change of cost level on some mechanization prognosis

Abstract

In this study a formula has been developed to describe the influence of the change of cost level on such a mechanization prognosis, where is assumed that wages and machine costs bear compound interest. In the study there are some numerical examples.

In the formula p1 = annual per cent increase of wages, p3 = annual per cent increase of machine costs, p2 = sudden and incident per cent increase of machine costs, and tv = delay in the profitability of mechanization.

The PDF includes a summary in English.

Original keywords
koneellistaminen; puunkorjuu; kustannukset; ennustaminen

English keywords
costs; mechanization; timber harvesting; prognosis

Published in 1974

Views 1487

Available at https://doi.org/10.14214/sf.a14744 | Download PDF

Creative Commons License CC BY-SA 4.0

Register
Click this link to register to Silva Fennica.
Log in
If you are a registered user, log in to save your selected articles for later access.
Contents alert
Sign up to receive alerts of new content

Your selected articles
Send to email
Harstela P., (1974) The influence of the change of cost level on som.. Silva Fennica vol. 8 no. 2 article id 4900 (remove) | Edit comment
Your search results