Current issue: 58(4)

Scopus CiteScore 2023: 3.5
Scopus ranking of open access forestry journals: 17th
PlanS compliant
Select issue
Silva Fennica 1926-1997
1990-1997
1980-1989
1970-1979
1960-1969
Acta Forestalia Fennica
1953-1968
1933-1952
1913-1932

Acta Forestalia Fennica no. 248 | 1995

Category : Article

article id 7510, category Article
Arto Rummukainen, Heikki Alanne, Esko Mikkonen. (1995). Wood procurement in the pressure of change. Acta Forestalia Fennica no. 248 article id 7510. https://doi.org/10.14214/aff.7510
Keywords: productivity; cost; timber harvesting; wood procurement; future scenarios
Abstract | View details | Full text in PDF | Author Info

Linear optimization model was used to calculate seven wood procurement scenarios for years 1990, 2000 and 2010. Productivity and cost functions for seven cutting, five terrain transport, three long distance transport and various work supervision and scaling methods were calculated from available work study reports. All methods are based on Nordic cut to length conditions. Finland was divided in three parts for description on harvesting conditions. Twenty imaginary wood processing points and their wood procurement areas were created for these areas. The procurement systems, which consists of the harvesting conditions and work productivity function, were described as a simulation model. In the LP-model the wood procurement system has to fulfil the volume and wood assortment requirements of processing points by minimizing the procurement cost. The model consists of 862 variables and 560 restrictions.

Results show that it is economical to increase the mechanical work in harvesting. Cost increment alternatives effect only little on profitability of manual work. The areas of later thinnings and seed tree- and shelterwood cuttings increase on cost of first thinnings. In mechanized work one method, 10-tonne one grip harvester and forwarder, is gaining advantage among other methods. Working hours of forwarder are decreasing opposite to the harverster. There is only little need to increase the number of harvesters and trucks or their drivers from today’s level. Quite large fluctuations in level of procurement and cost can be handled by constant number of machines, by alternating the number of season workers and by driving machines in two shifts. It is possible, if some environmental problems of large-scale summer time harvesting can be solved.

  • Rummukainen, E-mail: ar@mm.unknown (email)
  • Alanne, E-mail: ha@mm.unknown
  • Mikkonen, E-mail: em@mm.unknown

Register
Click this link to register to Silva Fennica.
Log in
If you are a registered user, log in to save your selected articles for later access.
Contents alert
Sign up to receive alerts of new content
Your selected articles