article id 10161, category Research article
Jussi Manner, Anders Mörk, Martin Englund. (2019). Comparing forwarder boom-control systems based on an automatically recorded follow-up dataset. Silva Fennica vol. 53 no. 2 article id 10161. https://doi.org/10.14214/sf.10161
Keywords: automation; cut-to-length logging; haulage; crane work; extraction; boom-tip control
Highlights: Boom-tip control saves time compared to the conventional system; This study introduced a field-study design enabling establishment of causal relationships during ordinary forwarding operations; Although the study design requires some extra arrangements, it efficiently combines the representativeness of conventional follow-up datasets with establishment of causal relationships that traditionally have been possible only through observational time studies or standardized experiments.
Abstract | Full text in HTML | Full text in PDF | Author Info

Crane work is the most time-consuming work element in forwarding. Hence, assist systems like boom-tip control are of interest. The first commercially available boom-tip control for forwarders was introduced in 2013. In this study we analysed whether replacing conventional boom control (CBC) with John Deere’s version of boom-tip control (named Intelligent Boom Control, IBC), increases crane-work productivity. We used data automatically gathered from 10 final-felling stands, covering typical logging conditions for southern, central and northern Sweden. Two John Deere 1510E and two John Deere 1910G forwarders were operated by seven experienced operators during the follow-up study, covering 1238 loads in total. A split-plot design was applied to isolate effects of the boom-control system being used (CBC, IBC). We found that using IBC for loading work (crane work and driving included) saved 5.2% of productive machine time compared to using CBC (p ≤ 0.05). The corresponding saving when using IBC for unloading work was 7.9% (p ≤ 0.05). Depending on geophysical factors, this corresponds to approximately 4% savings in productive machine time for forwarding as a whole, including pure transport (with and without load). Moreover, the study introduced in cut-to-length context a novel field-study design to collect a large follow-up dataset in the course of ordinary forwarding operations. We found the study design to be a cost-efficient way to combine the representativeness of conventional follow-up datasets with the ability to establish causal relationships. Establishment of causal relationships has traditionally been possible only through observational time studies or standardized experiments.

  • Manner, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden ORCID http://orcid.org/0000-0002-4982-3855 E-mail: jussi.manner@skogforsk.se (email)
  • Mörk, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden E-mail: anders.mork@skogforsk.se
  • Englund, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden E-mail: martin.englund@skogforsk.se

Category : Research note

article id 1717, category Research note
Jussi Manner, Olle Gelin, Anders Mörk, Martin Englund. (2017). Forwarder crane’s boom tip control system and beginner-level operators. Silva Fennica vol. 51 no. 2 article id 1717. https://doi.org/10.14214/sf.1717
Keywords: productivity; automation; cut-to-length logging; haulage; crane work; extraction; learning curve
Highlights: Boom tip control (BTC) allows the operator to control boom tip movements directly, instead of controlling each movement separately to achieve the desired boom tip movement; BTC eased boom control, so beginner-level operators using BTC achieved higher productivity than beginner-level operators using a conventional (reference) system; There were no significant differences in the slopes of learning curves between the systems.
Abstract | Full text in HTML | Full text in PDF | Author Info

The forwarder loads processed wood and transports it to a landing. Productivity of forwarding could be improved by increasing driving speed, but difficult forest terrain limits this. According to current literature, crane work is the most time-consuming work element of forwarding, so improving crane work productivity is essential for improving forwarding productivity. One way to do this is through automation of recurrent boom movement patterns, or alternatively automation can be used to ease crane work. When using conventional boom control (CBC), the operator manually controls each of the independent boom joint movements and combines them to achieve a desired boom tip movement, but boom tip control (BTC) allows the operator to control boom tip movements directly. The objective of the present study was to examine whether BTC facilitates crane work and affects the slopes of learning curves for beginner-level forwarder operators. The study was carried out using a standardised test routine to evaluate effects of two fixed factors, system (levels: CBC, BTC) and point of time (four levels), on five dependent variables. Four of the five dependent variables measured ease of boom control and the fifth measured crane work productivity. The results showed that there were no significant differences in the slopes of learning curves between the systems but the BTC did increase crane work productivity and made boom control easier.

  • Manner, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden ORCID http://orcid.org/0000-0002-4982-3855 E-mail: jussi.manner@skogforsk.se (email)
  • Gelin, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden E-mail: olle.gelin@skogforsk.se
  • Mörk, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden E-mail: anders.mork@skogforsk.se
  • Englund, The Forestry Research Institute of Sweden (Skogforsk), Uppsala Science Park, SE-751 83 Uppsala, Sweden E-mail: martin.englund@skogforsk.se

Register
Click this link to register to Silva Fennica.
Log in
If you are a registered user, log in to save your selected articles for later access.
Contents alert
Sign up to receive alerts of new content
Your selected articles